WE PRESENTLY SERVE THE ZELLWOOD AREA, WITH THREE WATER PLANTS.THE JONES PLANT WAS DRILLED IN 1949, AS THE RESIDENTS SAW THE NEED FOR A WATER SYSTEM.THE KING WATER PLANT WAS DRILLED IN 1972, AS THE SYSTEM CONTINUED TO GROW.A THIRD WELL WAS DRILLED IN 2019.
DatesJan 1, 2024 – Dec 31, 2024